Main Content

Important Physical Access Notices

Student Union Expansion & Renovation

The Student Union Expansion & Renovation project began on Monday, July 19, 2010 with the demolition of the Old Cafeteria.  The demolition of the Old Cafeteria marks the beginning of a new Student Union planned for completion in May 2013. Fencing will be placed around the Old Cafeteria and Facilities Development & Operations (FD&O) plan to ensure that all sidewalks around the facility are never blocked.  Construction trucks will be entering from San Salvador and exiting onto San Fernando. We will keep you posted of travelling routes and accessible parking as construction progresses. Please exercise caution when travelling through this area.   For more information, please refer to FD&O: Planning, Design & Construction Projects, Student Union Expansion and Campus Life

 

SJSU Construction & Utility Upgrade Projects (May 2013)

Main Campus Site Map

 

Shutdown Notices

Location:  SHC - Sidewalk along SPX from 7th to 6th Street

Schedule:  6/24/2013 till completion in 2015

Shutdown Description:  Sidewalk closed- sidewalk will remain open for emergency equiptment

Purpose:  Construction laydown