Spring Break Utility Shutdown-Main Campus

Facilities, Development & Operations is providing the campus community notice regarding the Spring Break Shutdown schedule for main campus heating ventilation & air conditioning (HVAC) and lighting systems. It is important to note that building temperatures during this time will generally be reduced. The Goal is to conserve energy at a time when university business is generally slow.The campus community is reminded to turn off lights, shut down computers and other office equipment, and close and lock exterior windows before leaving for the break.

Buildings that will NOT be affected by the shutdown are: Housing, King Library, Recreation Center, Student Union, Spartan Complex, and certain “special needs” areas.

The shutdown schedule is as follows: 

All main campus buildings will have limited lighting, heating or cooling during this time (emergency systems will not be affected). All ITS and online services will function normally during the spring break shutdown.

Day of Week, Month #, YYYY

At 7:00 a.m., the entire campus will be operating normally with heating and lighting.

Please contact Name, extension 4-#### or at email_address  if you have any questions or concerns about the shutdown. Thank you for your patience and cooperation.

  • Anton Kashiri, Associate Vice President for Facilities, Development & Operations

NOTE: Facilities, Development and Operations will be arranging limited HVAC and lighting for requested “after hours” operations. All special requests/exceptions during this period will need to be made through Facilities Development and Operations iService by Day of Week, DATE, to allow time for building systems to be scheduled. These requests should include the specific dates that offices will be occupied, as well as the number of occupants. For further information about building access during the winter break, please contact University Police at 924-2222.