Announcements

 

 

AEC COVID-19 Information

 

 

Physical Access Notices

 

Shutdown Notice

Location(s): CL
Schedule: 2/25/2020 - 3/5/2020 6am to 2pm

Shutdown Description: 

Replace existing windows with new on the North West side on the 5th floor from 6:00 AM to 2:00 PM. This task will take 6 days.

Walkway on west side of Clark Hall will be closed to all traffic. 

 


On April 1, 2019, SJSU
 will be putting fencing up for the construction of the new Interdisciplinary Science Building. The areas shown on the map will be fenced and marked as Construction Zone with no public access and shows where the temporary ADA ramp is located during construction – anticipated construction duration March 2022.

 

ISB Under Construction MAP

 

ISB Under Construction-closer look

Temporary Ramps and stairs

 

 

Forward SJSU Email to Preferred Personal Email

AEC continues to take steps to ensure that all communication sent to students is held secured and confidential – therefore all email communication sent to students from the AEC will be sent to students' SJSU-issued email address. To assist students in this transition, AEC has created a tutorial on how to forward messages from student SJSU-issued email accounts to a preferred email account (e.g. gmail, yahoo, hotmail, etc.).