Planning, Design & Construction Projects

ISB rendering    SJSU ISB


Interdisciplinary Science Building

San Jose State University is creating a state of the art science facility focused on faculty-led student research. The new 164,000 sq. ft. building will feature teaching labs, research labs, collaborative spaces, and faculty offices. The project, located north of Duncan Hall, will also house the College of Professional and Global Education (CPGE).

  • Status: Construction Phase
  • Construction Start: 4/2019 
  • Total Project Cost: $185,000,000

 

SAC East   SAC Overhead

 

Spartan Athletic Center 

A 57,000+ square foot moon shaped building located at the east side of CEFCU Stadium, is currently beginning its construction phase. The Spartan Athletic Center is a two story building that will service our athletics programs, including football and soccer with training space, team locker rooms, coaches' office spaces, players' lounge, leadership development center, clubrooms, and a dining area. The building also includes a 180 seats auditorium and a multi-purpose learning space for large meetings and evening classes. Site improvements include re-landscaping the area where the east bleachers were formerly located and installing some new stadium lighting.

Status: Construction Phase
Anticipated Construction Completion: Spring 2023
Total Project Cost: $57,633,000

 

Video 1   Video 2

 

CEFCU Stadium Video Displayboard & Scoreboard

Provided design performance specifications and construction services for adding a new video display board / score board to the north end zone of CEFCU Stadium. Scope also covered salvage and recycling specifications for demolition of upper bleacher seating. Project was delivered through the Design Build process via performance specifications.

  • Status - Construction Phase
  • Construction Duration: 3/2020-09/2021
  • Total Project Cost: $5,186,000

 

Parking Garage 1   Parking Garage 2

 

South Campus Parking Garage & Sports Field

South Campus Parking Garage and Sports Field Facility project has been completed and in operation. It is located on the corner of East Alma Ave and 10th St. The four level, reinforced cast-in-place concrete parking structure consists of 1,500 parking spaces, an IT room, two sports storage rooms and three individual restrooms. This parking structure will serve students and staff as well as the public for events. The cork infilled synthetic turf sports field directly adjacent to the parking garage will accommodate University recreational and intramural events. The field is striped for soccer, lacrosse and rugby. Outside of the field fence there will be a pedestrian concrete path around the perimeter, open for use by both the University and the general public.

Status: Complete
Anticipated Construction Completion: Fall 2021
Total Project Cost: $52,500,000

 

 SRAC 1   SRAC 2


Spartan Recreation and Aquatic Center

This facility includes multiple gymnasiums, weight and fitness centers, exercise rooms, rock climbing wall, sports club organizations, and competition and recreation pools with support spaces. The project site is located at south east corner of 7th Street and San Carlos across from the existing Event Center.

  • Status: SRAC opened on April 22, 2019
  • Construction Duration: 8/2016 - 5/2019
  • Total Project Cost: $132,000,000

 

 Beach Volleyball 1   Beach Volleyball 2

 

South Campus Beach Volleyball Courts

Provided all labor, equipment, materials, transportation, temporary construction, and site logistics as required to build (4) beach volleyball courts, south of the tennis courts, on South Campus. The scope included installation of erosion/sediment control, excavation and off-haul of approximately 2 feet of soil for the courts, safe-off/removal of existing irrigation lines, installation of filter fabric and associated drainage system, installation of removable 4 foot fence, installation of ADA access path, decomposed granite pad, reconnected irrigation lines and trucked the sand from 10th Street and Humboldt Street to the new volleyball courts. 

  • Status - Complete
  • Construction Duration: 3/2019-06/2019
  • Total Project Cost: $354,556